How long should I keep a finished project up?

Working with replit, and wondering there is a standard amount of time I should leave a submitted project up before freeing up more space. Working through the Data Analysis certification and limited to three replits without a subscription. Once I finish Medical Data, I’ll need to remove one of my projects.

The two projects I’ve finished. Calculator was mostly fighting with gitpod and replit until I got one environment to work. Then troubleshooting why my test kept failing because I didn’t name one of the dictionary categories correctly.

Demographics was first figuring out how to turn off AI code since it was auto completing the entire answer. Then it was just working out how to pull what I wanted and how to calculate. There are probably way cleaner ways to do this project, but was able to get all the test to pass.

the projects you link to complete certifications should always be available. You can change the link by resubmitting (like you move the code to a github repo and submit that)

Cool, I’ll get the completed ones moved to github then resubmit my links.